DOWNEAST TRAIL SEGMENTS "Shared Use Path" rail-with-trail: Planned by MDOT from Ellsworth Falls to Spring Street in Downtown Ellsworth for 2010 Construction. |
![]() |
Rail with Trail Connector Project: Spring Street to High Street area on City Streets, perhaps to end at the proposed STAR Center. |
|
Downeast Sunrise Trail Ellsworth: High Street area to Washington Jct. Segment to be designed by MDOT in 2010. See DEST below. |
![]() |
Downeast Sunrise Trail (DEST) (mostly completed in 2009): Washington Jct. to Ayers Jct. in Pembroke |
![]() |
|
Brewer to Calais rail-with-trail |
|
|
A proposed multi-use bridge north of Leonard Lake to connect the Downeast Trail to points west. |
![]() |