DOWNEAST TRAIL SEGMENTS

"Shared Use Path" rail-with-trail:

Planned by MDOT from Ellsworth Falls to Spring Street in Downtown Ellsworth for 2010 Construction.

Rail with Trail Connector Project:

Spring Street to High Street area on City Streets, perhaps to end at the proposed STAR Center.

Downeast Sunrise Trail Ellsworth:

High Street area to Washington Jct. Segment to be designed by MDOT in 2010. See DEST below.

Downeast Sunrise Trail (DEST) (mostly completed in 2009):

Washington Jct. to Ayers Jct. in Pembroke

MDOT Trail Planning website:

Brewer to Calais rail-with-trail

Union River Connector Project

A proposed multi-use bridge north of Leonard Lake to connect the Downeast Trail to points west.

Link to Bike-Ped Planning Page

City of Ellsworth Home Page -- Planning Home -- Planning Projects